Sector Setup
MWAN (National Center for Waste Management) regulates Saudi's USD 6B+ waste sector. Vision 2030 mandates 90% diversion from landfill — driving foreign entry in collection, recycling, hazardous waste, and waste-to-energy.
How do I set up a waste management & circular economy company in Saudi Arabia? 100%-foreign-owned LLC under MISA + MWAN sector licensing. Capital SAR 1M – SAR 25M+. Year-one cost USD 30,000 – USD 80,000+ year-one. Timeline 14–22 weeks. Sector regulators: MISA, MWAN, NCEC (Environmental Compliance Center), MEWA.
MWAN (National Center for Waste Management) regulates Saudi's USD 6B+ waste sector. Vision 2030 mandates 90% diversion from landfill — driving foreign entry in collection, recycling, hazardous waste, and waste-to-energy.
Recommended structure: 100%-foreign-owned LLC under MISA + MWAN sector licensing. Capital requirement: SAR 1M – SAR 25M+. Saudization band needed: Green.
Tamra runs end-to-end waste management & circular economy-sector setups — MISA, sector licensing, CR, banking, GR, ongoing compliance and workforce administration.
| Sector | Waste Management & Circular Economy |
|---|---|
| Recommended entity | 100%-foreign-owned LLC under MISA + MWAN sector licensing |
| Capital requirement | SAR 1M – SAR 25M+ |
| Year-one cost | USD 30,000 – USD 80,000+ year-one |
| Timeline | 14–22 weeks |
| Saudization band | Green |
| Sector regulators | MISA, MWAN, NCEC (Environmental Compliance Center), MEWA |
14–22 weeks
If you are testing the market, an EOR (hiring through Tamra's existing licence) is the lowest-commitment entry. For long-term presence, a 100%-foreign-owned LLC under MISA + MWAN sector licensing is the standard. Tamra runs both routes.
SAR 1M – SAR 25M+
14–22 weeks
MISA licence; MWAN waste-management operator licence; Environmental permit. Tamra coordinates these in parallel with MISA + CR.
Yes. Tamra holds an EOR licence and can sponsor your first 1–10 hires immediately, then transition them onto your entity once it is operational.